A product built by four vendors in sequence is a product that reflects four sets of compromises.

Product design and platform engineering for Indian companies. One team, first sketch to production deployment.

What this is

India's product development market has no shortage of engineering capacity.

What is consistently harder to find is a team that can make the product decisions and the platform decisions in the same conversation, so the product that ships is the one that was designed rather than an engineering approximation of it.

One team, from first sprint

The Citara Labs Product and Platform Engineering practice builds bespoke digital products for Indian B2B SaaS, fintech, edtech, and marketplace companies. Design and engineering are done by the same team.

The AI layer, where one is needed, is designed into the product from the first sprint rather than retrofitted after launch.

What is included

Six components, one team, first sketch to production.

01

Product strategy and scoping

The business problem, the user, and the platform constraints mapped before any design or engineering begins.

02

Experience design

UX architecture, interface design, and design system built for the specific product.

03

Platform architecture

Technology decisions made at design time with the engineering team in the room.

04

Full-stack engineering

Front-end, back-end, integrations, and production infrastructure.

05

AI integration where needed

Intelligence built into the product at design time.

06

Deployment and handover

Documentation, team training, and transition plan.

Who this is for

CTOs, founders, and heads of product at Indian B2B SaaS, fintech, edtech, and marketplace companies that need a new product built or an existing platform rebuilt from a stronger foundation.

Companies that have outgrown their MVP. Companies whose internal engineering team is fully allocated to existing product maintenance and cannot take on a new build. Companies that have tried building with separate design and engineering vendors and experienced the gap between the two.

Why the first four weeks matter

The decision about which framework to build on, which data architecture to use, and how the AI layer connects to the product logic is made in the first four weeks of a build.

Getting those decisions right requires the design thinking and the engineering thinking in the same room. That is the structure of every engagement we take on.

How it starts

Three steps from first conversation to the project running.

01

Scoping conversation

A scoping conversation first, to establish fit.

02

Discovery

A paid discovery engagement follows: four to six weeks mapping the product, the platform, and the integration requirements. Discovery produces the project scope, the architecture proposal, and the fixed-price engagement proposal.

03

Project begins

The build follows, with design and engineering decisions made together from the first sprint.

From the
Thinking
section

The studio model is broken. Here is what we built instead.

Why splitting brand, product, and engineering across teams and handoffs produces work that reflects the fact that more than one team made it, and what a different structure looks like.

Read →
Better made.

For companies whose ambition has outgrown the category of vendor they have been buying from.

Either design and engineering happen in the same room, or the product ships carrying the gap between them.

Start a conversation